Ron confirmed that finished loads will be the only rail traffic for the plant. The incoming gypsum is stockpiled near Irving Paper and trucked to the plant. As I reported before, some of the gypsum is brought by rail from Belledune.
Thanks for the report and photos, Ron!
No comments:
Post a Comment